NEWS

PM Modi to Flag Off Northeast’s 1st Vande Bharat Train Today; Check Routes, Timings & Other Details

Vande Bharat

The train will depart from New Jalpaiguri and arrive in Guwahati, making stops at New Cooch Behar, New Alipurduar, Kokrajhar, New Bongaigaon, and Kamakhya along the way

Prime Minister Narendra Modi will flag off Northeast India’s first Vande Bharat Express train connecting Assam’s Guwahati and West Bengal’s New Jalpaiguri via video conferencing at 12 noon on Monday. The state-of-the-art train will provide people of the region the means to travel with speed and comfort and enhance tourism in the area.

Read More: New Parliament House Inaugurated With Historic ‘Sengol’ Ceremony: What Will Happen To The Old Building Now?

Ahead of the event, PM Modi in a tweet said he is “delighted” to flag off Assam’s first Vande Bharat Express. “I am delighted to flag off Assam’s first Vande Bharat Express tomorrow, 29th May, at 12 noon. This state-of-the-art train embodies our commitment to providing speed, comfort and enhanced connectivity. It will also boost tourism and enrich socio-economic development,” he said.

By connecting Guwahati with New Jalpaiguri, the train will significantly reduce the duration of the journey, saving approximately one hour compared to the current fastest train between the two destinations. With a travel time of 5 hours and 30 minutes, Vande Bharat Express surpasses the current fastest train, which takes 6 hours and 30 minutes for the same route, the official statement by the Prime Minister’s Office said.

Read More: ISRO GSLV F12/NVS -1 Mission: Rocket Carries 2nd-gen NavIC Satellite

PM TO INAUGURATE ELECTRIFIED RAILWAY SECTIONS, DEMU SHED

The Prime Minister will also inaugurate 182 kilometers of newly electrified railway sections, promoting eco-friendly transportation with faster train speeds and reduced travel time. This milestone not only facilitates cleaner and more efficient train operations but also paves the way for trains operating on electric traction to enter Meghalaya, the statement read.

The Prime Minister will also unveil a newly constructed DEMU/MEMU shed at Lumding. This state-of-the-art facility will play a crucial role in maintaining the DEMU rakes operating in the region, ensuring improved operational feasibility and efficiency.

ROUTES OF VANDE BHARAT EXPRESS

The newly introduced Vande Bharat Express, operating six days a week, will travel from New Jalpaiguri to Guwahati, with halts at only four stations: New Alipurduar, Kokrajhar, New Bongaigaon, and Kamakhya, providing a fast and convenient mode of transportation for IT professionals, businessmen, students, and tourists in the region. Passengers can conveniently board and disembark at a total of six stops along this route, according to News18 reports.

Read More: Sisodia Generated Rs 622.67 Cr POC in Excise Policy Scam: ED

With its high speed, it will be the fastest train in this sector, offering significant benefits to travelers.

From Wednesday to Monday, the train numbered 22227 will depart from New Jalpaiguri at 6:10 am, reaching Guwahati by 11:40 AM. On its return journey, train number 22228 will depart from Guwahati at 4:30 pm, making stops at Kamakhya, New Bongaigaon, Kokrajhar, and New Alipurduar before reaching New Jalpaiguri at 10:20 pm.

On Tuesdays, the train will not be operational.

SPEED OF VANDE BHARAT TRAIN

While the Vande Bharat Express will operate at a speed of 110 km/hr on this particular route, it demonstrated a capability to reach speeds of 180 km/hr during testing. Notably, on most routes, Vande Bharat trains maintain a speed of 110 km/hr.

There are already existing Vande Bharat trains in West Bengal, running between New Jalpaiguri and Howrah, as well as between Howrah and Puri in Odisha. These trains, known for their amenities and speed, have gained immense popularity among passengers, with nearly 100% occupancy rates on most routes.

Indian Railways has ambitious plans to introduce a total of 400 Vande Bharat Express trains across the country in the near future, while currently, there are 17 semi-high-speed trains in operation in India.

Source :
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Most Popular

To Top